Title
TO AUTHORIZE THE MAYOR TO ENTER INTO CONTRACT WITH W.E. STILSON CONSULTING GROUP FOR CONSTRUCTION ADMINISTRATION AND INSPECTION SERVICES FOR WESTSIDE SEWER IMPROVEMENTS PHASE 1 AND PHASE 2; IMPROVEMENT NOS. ST-937 AND ST-944; AND TO DECLARE AN EMERGENCY.
Drafter
dj
Body
WHEREAS, along with the awarding of the Westside sewer project, construction administration and inspection services are needed; and
WHEREAS, W.E. Stilson was the design engineer on the project and the Director of Public Service has recommended we proceed with them for the administration and inspection services; and
WHEREAS, it is imperative to move forward with this project by early September so that it can be finished before winter, and all for the preservation of the public peace, property, health, safety and welfare;
NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF GAHANNA, STATE OF OHIO:
Section 1. That the Mayor is hereby authorized to enter into contract with W.E. STILSON CONSULTING GROUP, 355 E. Campus View Blvd., Suite 250, Columbus, Ohio 43235, for contract administration and inspection services for the Westside Sewer project Phase 1 and Phase 2, Improvement Nos. ST-937 and ST-944; proposal attached as EXHIBIT A and made a part herein.
Section 2. That funding in the amount of TWENTY TWO THOUSAND NINE HUNDRED DOLLARS ($22,900) was set aside in the 2010 Appropriations to Account No. 662.361.5596, Sewer Capital Projects/Improvements, to cover the herein costs.
Section 3. That second reading is hereby waived.
Section 4. That, for the reason set forth in the preamble herein above, this ordinance is declared emergency legislation and shall be in full force and effect immediately upon passage by this Council and on date of signature approval by the Mayor.